



Do you have feedback or comments for us? Share it! We love to hear from our visitors :)
Also, we will share updates about our company here. So do check back for updates!
Click below to see contributions from other visitors to this page...
MT New Constellation, 24th November 2011 – 25th November 2011
Not rated yet
24 November 2011
Dismantle and wash the PV Valve.
Change all the O-Rings that was provided and assemble back the PV Valve.
Set up Test Rig for testing....
MT Oceanic Coral, 12th December 2011 & 19th December 2011
Not rated yet
12th December 2011
Prepare tools and travel to West Coast Pier to attend vessel and found that the O2 Analyzer’s Zero Gas was below -2.9% and the Span ...
KHK Vision, 02nd December 2011 – 14th December 2011
Not rated yet
02nd December 2011
Attended vessel and meet up with Superintendent, but was told that there is not enough pneumatic air for checking.
Scrubber inspection ...
MT Pacific Ruby, 28th November 2011
Not rated yet
28th November 2011
Informed by Superintendent to attend MT Pacific Ruby on urgent basic for troubleshooting the system as she going to berth in the afternoon....
MT Oversea Nedimar, 04th November 2011 – 05th November 2011
Not rated yet
04th November 2011 Friday
Reached Marina South Pier for launch to Vessel.
Attended vessel, then meet up with Chief Engineer and other automation engineer ...
Professsional at work
Not rated yet
In my opinion, Mr. Goh is the best professional inert gas generator hands one service engineer you can find in Singapore.
